Answer:
OPC - Ordinary Portland Cement
PPC - Portland Pozzolana Cement
PSC – Portland Slag Cement
2) What is major difference in 3 type of cement?
Answer:
OPC – General Form of cement (max. used).
PPC - partial replacement of OPC with Fly Ash.
(15 % to 35 %)
PSC – Partial replacement of OPC with Slag
(20 % to 70 %)
3) Which is cement is best for house construction?
Answer:
OPC – it is recommended for RCC work
( Footing, Beam, Column, Slab)
PPC and PSC – It is recommended for Masonry work, plaster work, tiling work, waterproofing work.
4) Why OPC Cement Recommended for RRC work?
Answer:
OPC – With OPC, We get..
High early strength gain by concrete
Early Removal of Formwork
5) Why PPC Cement Recommended Masonry and Plasterwork?
Answer:
PPC & PSC – while using these cement strength is not important criteria.
These cement produce less heat of hydration
So, less chances of cracking.
6) What, if OPC Cement is not available in local market?
Answer:
In such situation , we can use PPC or PSC.
But, Curing period must be extended.
For OPC – 7 days, PPC & PSC – 10 days
Must Watch video
Watch more : How to draw house plan step by step -
Watch more - how to make house plan -
Visit my website :
Free Download this Thumb Rule Visit my Website :
1000 sq. ft. Concrete Slab Construction Cost :
Watch also : cost of construction for 1000 square feet house :
Watch other videos
Estimation - Centre Line Method in excel sheet
One room Estimation :
Building Estimate Full Quantity:
Column footing Estimation :
Estimation of Stair Quantity:
Beam Estimation:
Slab Estimation:
Building Estimation Long wall Short wall method :
Multi Room Building Estimation :
Three Room Building Estimation:
Method of Finding out centre line of building :
Building Estimation total quantity centre line method :
Follow MY FACEBOOK PAGE :
0 Comments